Active Alerts1 Critical1 Warning

Operations

Real-time

Site-level production monitoring, ore processing metrics, and equipment utilization

Last updated: 14 Mar 2026, 14:58 AWST

Site:
On Track

Total Ore Mined

189.4Mt
+2.8%vs Q1 FY2025Ore Milled: 116.1 Mt
On Track

Concentrator Throughput

52.6Mt
+1.4%vs prior quartervs Design Capacity: 98.7%
Monitor

Avg Copper Grade

0.84%
-0.9%vs Q1 FY2025Grade Target: 0.87% target
On Track

Avg Recovery Rate

87.6%
+1.2%vs prior quarterPrior Year: 86.4% prior yr
At Risk

Unplanned Downtime

4.8hrs/day
-12.4%improvementPrimary cause: WAIO — haul road
Monitor

Equipment Utilization

87.4%
-2.1%vs targetTarget: 90%

Production by Site — Q1 FY2026

Payable metal in concentrate / ore mined (kt/Mt)

Processing Metrics

Concentrator utilization by site

Escondida96.6%
Throughput: 32.49 MtRecovery: 88.4%
WAIO94.0%
Throughput: 64.8 MtRecovery: 97.2%
Olympic Dam102.1%
Throughput: 2.73 MtRecovery: 91.7%
Nickel West89.3%
Throughput: 5.83 MtRecovery: 83.6%
QLD Coal101.9%
Throughput: 9.84 MtRecovery: 94.8%

Site Production Detail

Q1 FY2026 · BHP operational report · 13 operations

Site
Operation
Commodity
Ore Mined (Mt)
Ore Milled (Mt)
Grade
Recovery %
QTD Production
Prior Qtr
Prior Year
Variance %
Status
EscondidaSpencer (sulphide)Copper109.41632.4880.87%88.4%282.4 kt268.1268.1+5.3%Above Target
EscondidaPampa Norte (oxide)Copper4.6231.5060.51%79.2%35.7 kt36.136.1-1.1%On Track
EscondidaCerro ColoradoCopper2.7341.0180.52%77.8%14.8 kt15.415.4-3.9%Below Target
Nickel WestMt Keith / LeinsterNickel5.8305.1741.12%83.6%18.3 kt19.919.9-8.0%Below Target
Olympic DamCopper South AustraliaCopper2.7342.0171.24%91.7%21.8 kt19.819.8+10.1%Above Target
Olympic DamGold — Olympic DamGold2.7342.0170.46 g/t71.4%87.4 koz82.182.1+6.5%Above Target
Olympic DamSilver — Olympic DamSilver2.7342.0173.1 g/t64.2%202.0 koz197.4197.4+2.3%On Track
QLD CoalGoonyella RiversideMet Coal3.1202.91024.1% ash94.8%3.1 Mt3.03.0+2.6%On Track
QLD CoalPeak DownsMet Coal2.8402.68023.8% ash94.4%2.8 Mt2.92.9-2.4%On Track
QLD CoalMount ArthurEnergy Coal3.6703.67026.4% ash100%3.7 Mt3.43.4+7.6%Above Target
WAIONewman JVIron Ore38.40038.40061.8% Fe97.2%38.4 Mt39.139.1-1.8%At Risk
WAIOJimblebar JVIron Ore14.70014.70062.1% Fe97.8%14.7 Mt14.214.2+3.5%Above Target
WAIOYandi JVIron Ore11.70011.70057.4% Fe96.4%11.7 Mt12.112.1-3.3%Below Target