Total Ore Mined
189.4Mt
+2.8%vs Q1 FY2025Ore Milled: 116.1 Mt
On Track
Concentrator Throughput
52.6Mt
+1.4%vs prior quartervs Design Capacity: 98.7%
Monitor
Avg Copper Grade
0.84%
-0.9%vs Q1 FY2025Grade Target: 0.87% target
On Track
Avg Recovery Rate
87.6%
+1.2%vs prior quarterPrior Year: 86.4% prior yr
At Risk
Unplanned Downtime
4.8hrs/day
-12.4%improvementPrimary cause: WAIO — haul road
Monitor
Equipment Utilization
87.4%
-2.1%vs targetTarget: 90%
Production by Site — Q1 FY2026
Payable metal in concentrate / ore mined (kt/Mt)
Processing Metrics
Concentrator utilization by site
Escondida96.6%
Throughput: 32.49 MtRecovery: 88.4%
WAIO94.0%
Throughput: 64.8 MtRecovery: 97.2%
Olympic Dam102.1%
Throughput: 2.73 MtRecovery: 91.7%
Nickel West89.3%
Throughput: 5.83 MtRecovery: 83.6%
QLD Coal101.9%
Throughput: 9.84 MtRecovery: 94.8%
Site Production Detail
Q1 FY2026 · BHP operational report · 13 operations
Site | Operation | Commodity | Ore Mined (Mt) | Ore Milled (Mt) | Grade | Recovery % | QTD Production | Prior Qtr | Prior Year | Variance % | Status |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Escondida | Spencer (sulphide) | Copper | 109.416 | 32.488 | 0.87% | 88.4% | 282.4 kt | 268.1 | 268.1 | +5.3% | Above Target |
| Escondida | Pampa Norte (oxide) | Copper | 4.623 | 1.506 | 0.51% | 79.2% | 35.7 kt | 36.1 | 36.1 | -1.1% | On Track |
| Escondida | Cerro Colorado | Copper | 2.734 | 1.018 | 0.52% | 77.8% | 14.8 kt | 15.4 | 15.4 | -3.9% | Below Target |
| Nickel West | Mt Keith / Leinster | Nickel | 5.830 | 5.174 | 1.12% | 83.6% | 18.3 kt | 19.9 | 19.9 | -8.0% | Below Target |
| Olympic Dam | Copper South Australia | Copper | 2.734 | 2.017 | 1.24% | 91.7% | 21.8 kt | 19.8 | 19.8 | +10.1% | Above Target |
| Olympic Dam | Gold — Olympic Dam | Gold | 2.734 | 2.017 | 0.46 g/t | 71.4% | 87.4 koz | 82.1 | 82.1 | +6.5% | Above Target |
| Olympic Dam | Silver — Olympic Dam | Silver | 2.734 | 2.017 | 3.1 g/t | 64.2% | 202.0 koz | 197.4 | 197.4 | +2.3% | On Track |
| QLD Coal | Goonyella Riverside | Met Coal | 3.120 | 2.910 | 24.1% ash | 94.8% | 3.1 Mt | 3.0 | 3.0 | +2.6% | On Track |
| QLD Coal | Peak Downs | Met Coal | 2.840 | 2.680 | 23.8% ash | 94.4% | 2.8 Mt | 2.9 | 2.9 | -2.4% | On Track |
| QLD Coal | Mount Arthur | Energy Coal | 3.670 | 3.670 | 26.4% ash | 100% | 3.7 Mt | 3.4 | 3.4 | +7.6% | Above Target |
| WAIO | Newman JV | Iron Ore | 38.400 | 38.400 | 61.8% Fe | 97.2% | 38.4 Mt | 39.1 | 39.1 | -1.8% | At Risk |
| WAIO | Jimblebar JV | Iron Ore | 14.700 | 14.700 | 62.1% Fe | 97.8% | 14.7 Mt | 14.2 | 14.2 | +3.5% | Above Target |
| WAIO | Yandi JV | Iron Ore | 11.700 | 11.700 | 57.4% Fe | 96.4% | 11.7 Mt | 12.1 | 12.1 | -3.3% | Below Target |